Hydroplast Hydroseal Canada PVC Sch 80 Pipe fittings Dealers and Supplier in Karachi Lahore Islamabad Quetta Pakistan Contact: +92-321-2248975 | Email: irfanfarooqi@gmail.com
Sunday, March 29, 2020
Sunday, March 22, 2020
upvc AGM SDR series
AGM upvc
Unplasticized Polyvinyl chloride (UPVC) is one of the most broadly used thermoplastic materials, common to many industries. UPVC is highly resistant to acids, alkalis, alcohols, and many other corrosive materials. AGM uses its own custom blend of UPVC compound to ensure that desirable physical properties are maintained with every production run.
AGM UPVC SDR is ideal for numerous applications when a standard ratio dimension is required. Pipes are available in white colors.
AGM SDR UPVC pipes can withstand temperatures up to 140°F (60°C).
AGM UPVC offers SDR Series sdr 41 , sdr 26 and sdr 32.5
AGM UPVC offers SDR Series sdr 41 , sdr 26 and sdr 32.5
Saturday, March 14, 2020
RAKtherm PPRC PIPE JOINING METHODS
RAKtherm PPRC PIPE JOINING METHODS
The most important elements for the installation of plastic pipe manufacturers and consumers reliability , quality of materials used by a resource to the point of being healthy is also important. The Merge method used in pprc pipes, socket welding method is called. Supply socket method ; with the support of the welding machine, pprc pipe and fittings to each other is made through melting and bonding of the source method. Step-by-step;
- The pipe, the pipe in the direction perpendicular to the axis of the pipe with sharp shears will be private so only the cutting process is done properly.
- The welding machine at 260°C. It should be heated up.
- Pipes and fittings welding machine by keeping ittirili toward each other from the translator. (Refer to the following resource table by looking at the source and the cooling period)
- The Merge takes place immediately from the source machine to the pipe and fittings . During this process, without compromising the axis of the pipe and fittings must be combined. So, when you put the parts in contact they must be omitted. Precautions against errors which will be held during the application process should be taken very carefully. Otherwise it is likely that the loss of gaps between pipes and fittings and giving rise to a homogeneous structure. Now this give information about the measures that must be considered and taken;
Pipe should be cutted with a pipe cutter and pipe segment in the direction perpendicular to the axis.
- Foiled foil for pprc pipe welding should be peeled while. After becoming made to the source of particles should be peeling foil pipes are not sure. The source of pprc pipe and fittings should not be contaminated.
- Source socket PPRC pipes 260 °C are carried out. The source of the source machine before the start of 260 °C. The heated, should be controlled.
- You should be careful with the source of standby time. In the melting process, while it is definitely not pipe and fittings should be returned.
- Parts bevel gear connections should not be used.
- After the flooring installation has finished, the sealing test should be performed.
- The welding machine at 260°C. It should be heated up.
- Pipes and fittings welding machine by keeping ittirili toward each other from the translator. (Refer to the following resource table by looking at the source and the cooling period)
- The Merge takes place immediately from the source machine to the pipe and fittings . During this process, without compromising the axis of the pipe and fittings must be combined. So, when you put the parts in contact they must be omitted. Precautions against errors which will be held during the application process should be taken very carefully. Otherwise it is likely that the loss of gaps between pipes and fittings and giving rise to a homogeneous structure. Now this give information about the measures that must be considered and taken;
Pipe should be cutted with a pipe cutter and pipe segment in the direction perpendicular to the axis.
- Foiled foil for pprc pipe welding should be peeled while. After becoming made to the source of particles should be peeling foil pipes are not sure. The source of pprc pipe and fittings should not be contaminated.
- Source socket PPRC pipes 260 °C are carried out. The source of the source machine before the start of 260 °C. The heated, should be controlled.
- You should be careful with the source of standby time. In the melting process, while it is definitely not pipe and fittings should be returned.
- Parts bevel gear connections should not be used.
- After the flooring installation has finished, the sealing test should be performed.
Subscribe to:
Posts (Atom)
Online Orders
Hydroplast online store price and orders available.
-
Q-therm pprc, qtherm pprc pipes imported from UAE Range : 20mm to 110mm complete pipe and fittings with aluminium and faiber coated pipes
-
pprc pipe Q-therm PPRC Piping System is an absolute solution for distribution application of hot & cold water in all modern residential...